Tub Drain Trap Seal
Posted: Tue Jul 13, 2021 12:01 pm
As long as I can remember (and I've been looking for a plumbing code to support this installation but can't find it) when building on a slab, the trap is installed "below" the level of the finish floor. When a plumber is finished hooking up the drain, some plumbers fill the area around the trap with soil and pour soft tar into the hole on top of the soil. Some plumbers don't seal that space. What code covers this specific installation or is this "pouring tar in the hole to seal it" a "local plumber thing?"