by Jerry Peck - Codeman on Tue Mar 08, 2016 8:29 pm
Yes, each unit needs to be tested individually.
Some AHJs also require the common areas to be tested too as the common areas have their own systems.
Better contractors will do three tests:
- pre-insulation/drywall (sealed attics) as that allows the tester to identify leakage areas in the structural envelope
- pre-insulation/drywall (after drywall lid for vented attics) for same reason
- after drywall (easier to find and fix things before painting and finishes are applied/installed
- after all work is complete (this would be the required test)
The first two tests typically save the contractor/builder money by avoiding any work at the final required test.
Jerry Peck - CodeMan
AskCodeMan.com
Construction Litigation Consultant - Retired
Construction and Code Consultant - Semi Retired